Method for reducing molten raw materials, and device for carrying out said method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11015869
APP PUB NO 20170314861A1
SERIAL NO

15520211

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for reducing molten raw materials, includes placing the raw materials, in a solid or molten state, on an inductively heated bed with coke pieces. The reduced melt that runs off the coke bed is collected and the waste gases are discharged. A coke bed is inwardly limited by a tube-shaped element through which the reaction gases are drawn off via a plurality of draw-off openings in the tube-shaped element. The corresponding device has a reactor for a bed with coke pieces and an induction heater with at least one induction coil. The reactor has a loading opening and a discharge opening for the treated melt. The coke bed is ring-shaped around a tube-shaped element. The material of the tube-shaped element allows inductive coupling to the induction field of the induction coil and it has draw-off openings for drawing off reaction gases from the coke bed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHOWA DENKO CARBON GERMANY GMBH86405 MEITINGEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Edlinger, Alfred Bartholomaeberg, AT 58 273
Steppich, Daniel Ziemetshausen, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 25, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00