Injection molded shaft

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11022199
APP PUB NO 20190178345A1
SERIAL NO

16238222

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a shaft body, a first end in an axial direction of a core part having a crisscross cross section orthogonal to the axial direction is connected to a helical gear via a first connecting part, and the second end in the axial direction of the core part is connected to a worm via a second connecting part. A plurality of first framework parts are formed at regular intervals along a direction of a shaft core in the core part between the first connecting part and the second connecting part. A second framework part extends across the first connecting part, the first framework part, and the core part like a diagonal brace. A third framework part extends across a pair of the first framework parts adjacent to each other and the core part like a diagonal brace. A fourth framework part extends across the second connecting part, the first framework part, and the core part like a diagonal brace.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENPLAS CORPORATIONSAITAMA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Okamoto, Shinichiro Saitama, JP 28 441
Suzuki, Yasuhiro Saitama, JP 445 4205

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 1, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00