Bilobe or multilobe tank

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11022252
APP PUB NO 20190078735A1
SERIAL NO

16185827

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exemplary bilobe or multilobe tank for storing liquefied natural gas includes at least two tank sections, each tank section having a curved upper surface and curved bottom surface, the tank sections being joined to each other so that the tank has an undulating upper surface and an undulating lower surface. Each tank section is connected to an adjacent tank section with at least one connecting duct so that a horizontal flow path is formed between the lowermost points of the adjacent tank sections or between the uppermost points of the adjacent tank sections.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WARTSILA FINLAND OY65100 VAASA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adamowicz, Maciej Gdynia, PL 2 0
Jansson, Mathias Vaasa, FI 10 40
Koczur-Grazawska, Malgorzata Gdynia, PL 2 0
Malys, Marcin Gdynia, PL 2 0
Råholm, Martin Vaasa, FI 3 3
Slusarski, Grzegorz Gdynia, PL 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 1, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00