Process and products using a rotary compression unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11034905
APP PUB NO 20170073598A1
SERIAL NO

15263264

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fertilizer/soil conditioner or a fuel source material is formed by processing animal waste by-products through the use of a rotary biomass dryer system. The animal waste by-product includes without limitation manure obtained from cattle or swine; feed lot bedding, poultry litter, a digestate of animal waste by-products obtained from an anaerobic digester, municipal waste, waste meat renderings, waste meat, or a mixture thereof. The processed material may comprise a higher amount of ash and a lower amount of volatile material than the animal waste by-product. The processed material may be stored as a powder or processed into pellets, logs, pucks, briquettes or another convenient shape form.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECAP BIOENERGY LLCP O BOX 99 LADDONIA MO 63352

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heimann, Robert Centralia, US 11 55
Talley, Allison Mexico, US 5 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 15, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00