Soft-starter AC-AC converter with integrated solid-state circuit breaker and method of operation thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11038340
APP PUB NO 20190089146A1
SERIAL NO

15711152

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An AC-AC power converter, such as a motor soft starter, includes an input connectable to an AC source with a disconnect switch, an output connectable to an AC load, and phase lines connecting the input and output to transmit power. In-line solid-state switching blocks are connected between line terminals and load terminals of the AC source and AC load, respectively, such that each phase line includes a solid-state switching block connected thereto. Free-wheeling solid-state switching blocks are connected to the load terminals at one end and together at a common connection at another end, such that each phase line includes a free-wheeling solid-state switching block connected thereto. Each of the in-line and free-wheeling solid-state switching blocks comprises a bi-directional switching block that selectively controls current and withstands voltage in both directions. The switching blocks also provide soft-starter functions, variable speed control, and integrated circuit breaker protection capability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITED30 PEMBROKE ROAD DUBLIN 4

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Huaqiang Menomonee Falls, US 46 236
Woodley, Kaijam M Brown Deer, US 12 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00