Excavation tool for making diaphragms and related excavation equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11041282
APP PUB NO 20190106855A1
SERIAL NO

16153059

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An excavation tool for making ground excavations for panels and diaphragms includes at least one rotary excavation drum. At least one frame is adapted to support the excavation drum. At least one pump is adapted for suction of an excavation fluid. A brushless electric motor is adapted to put in rotation the at least one excavation drum. At least one mechanical reducer is operationally connected to the electric motor and the at least one excavation drum. The electric motor is installed in the frame and coaxial to the at least one excavation drum. The at least one mechanical reducer is coaxial to the electric motor and the at least one excavation drum. The at least one mechanical reducer is adapted to transfer rotary motion from the electric motor to the at least one excavation drum.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOILMEC S P A47522 CESENA (FC)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Curic, Jasmin San Mauro Pascoli, IT 5 19
Fontana, Pietro Cesena, IT 6 18
Laghi, Matteo Forlì, IT 3 8
Mantovani, Francesco Cesena, IT 5 7
Raffuzzi, Mirco Armando Cervia, IT 4 6
Villa, Daniele Rimini, IT 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 22, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00