Boosted gas burner assembly with temperature compensation and low pressure cut-off

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11041620
APP PUB NO 20200103105A1
SERIAL NO

16143539

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas burner assembly and a method of operating the same are provided. The gas burner assembly includes an air pump that supplies a flow of air into a boost fuel chamber for mixing with a flow of boost fuel before being combusted and directed through a plurality of boost flame ports. A temperature sensor is positioned proximate the air pump and a controller regulates the power supplied to the air pump to compensate for air pump operating characteristics based on the measured temperature. A pressure sensor may also detect a low pressure condition downstream of the air pump and shut down the fuel and air supply system accordingly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAIER US APPLIANCE SOLUTIONS INCCORPORATION TRUST CENTER 1209 ORANGE STREET WILMINGTON DE 19801

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cadima, Paul Bryan Crestwood, US 162 953

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 22, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00