Catalyst guard

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11041836
APP PUB NO 20180321203A1
SERIAL NO

15806597

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A furnace system features a combination of a furnace, a main combustion furnace tube and a disposable guard tube. The main combustion furnace tube is configured to couple and extend from the furnace, made of a quartz tube material, and has a zone for a combustion catalyst or high temperature support configured or formed therein. The disposable guard tube is coupled to the main combustion furnace tube, has a top opening configured to receive and have direct exposure to a liquid sample being injected into the main combustion furnace tube, and also has a bottom opening to provide the liquid sample to the main combustion furnace tube for processing in the zone for the combustion catalyst or high temperature support.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
O I CORPORATION151 GRAHAM RD COLLEGE STATION TX 77845

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bauman, Noel C College Station, US 6 9
Killgore, Joan Zarate Iola, US 1 0
Slaton, James G College Station, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00