Variable valve lift system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11047267
APP PUB NO 20200340373A1
SERIAL NO

16823568

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A summation rocker system is disclosed for acting on the end of a stem of a poppet valve (16) in dependence upon the combined lifts of a first and a second cam profile defined by different cam lobes (14, 22) of a concentric camshaft (46). The system comprises a first rocker (12) mounted on a pivot shaft (18) and having a first follower (44) to contact the first cam profile and an end acting on the valve (16) to displace the valve (16) by an amount dependent upon the lift of the first cam profile, a rocker shaft (24) to be fixedly mounted on the engine, and a second rocker (20) pivotable about the rocker shaft (24), the second rocker (20) having a second follower (48) to contact the second cam profile and acting to displace the pivot shaft (18) of the first rocker (12) in dependence of the lift of second cam profile. The rocker shaft (24) intersects a plane containing the axis of the pivot shaft (18) and the end of the first rocker (12) acting on the valve stem, and the first rocker (12) includes a cut-out (26) for receiving the rocker shaft (24), which cut-out (26) is configured and dimensioned to prevent the rocker shaft (24) from interfering with movement of the first rocker (12).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MECHADYNE INTERNATIONAL LTDPARK FARM ESTATE KIRLINGTON OXFORDSHIRE OX5 3JQ

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lancefield, Timothy Mark Shipston on Stour, GB 36 378
Methley, Ian Witney, GB 50 494
Webb, Kyle Abingdon, GB 7 156

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 29, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00