Combination structure for a hose connected between an air compressor and a tire

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11052621
APP PUB NO 20190193349A1
SERIAL NO

16221216

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combination structure for a hose connected between a tire and an air compressor is disclosed. The air compressor includes a box in which a compressor unit and a sealant bottle are installed. The sealant bottle has an inlet and an outlet. The inlet of the sealant bottle is connected to one outlet tube of the compressor unit. The hose has a first end and a second end. The first end of the hose is adapted to be connected to the outlet tube of the sealant bottle. The second end of the hose can be connected to the combination structure, which generally includes a cap, a core element, and a plug. With the combination structure, the chemical sealant contained in the sealant bottle can be prevented from flowing out to contaminate objects due to incorrect operation or negligence.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIK WORLD INDUSTRIAL CO LTDTAINAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chou, Wen-San Tainan, TW 112 682

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 6, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 6, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 6, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00