Electrical power generator for producing oscillating movement of a structure and converting oscillating movement into electrical energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11053914
APP PUB NO 20190101100A1
SERIAL NO

16086957

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical power generator includes a first part having an elongated shape, a first end and a second end. The first part is arranged for attachment to a base in correspondence with the first end and configured to be located in a fluid and configured such that, when said fluid moves, the first part generates vortices in said fluid so that a lift force is generated on the first part, which produces an oscillating movement of the first part. In addition, the generator includes a subsystem configured for converting the oscillating movement of the first part into electrical energy. The subsystem is at least partially housed within the first part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VORTEX BLADELESS S L05001 ÁVILA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yáñez, Villareal David Jesús Ávila, ES 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 6, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 6, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 6, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00