Cross-linked rubber and production method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11084910
APP PUB NO 20200115512A1
SERIAL NO

16618231

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a cross-linked rubber that can improve long-term sealing properties of a seal member in high-temperature and high-pressure environments. The cross-linked rubber is obtained through cross-linking of a cross-linkable rubber composition containing a fluororubber, carbon black, one or more carbon nanotubes, and an organic peroxide cross-linker, and has a 50% modulus of 5 MPa or more, a compression set (230° C., 500 hours) of 80% or less, and a rate of change of elongation at break between before and after a heat aging test (230° C., 72 hours) of not less than −10% and not more than 10%.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZEON CORPORATIONTOKYO 100-8246

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ata, Seisuke Tsukuba, JP 8 39
Hata, Kenji Tsukuba, JP 68 1099
Komatsu, Anna Tokyo, JP 1 0
Komatsu, Masaaki Tokyo, JP 57 280
Tomonoh, Shigeki Tsukuba, JP 5 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00