Auxin-enhanced phytoremediation process for removal of metal contaminants from polluted soil and fly ash from coal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11097322
SERIAL NO

16406245

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The phytoremediation process for removing hazardous metals, such as Be, Cr, Co, Mn, and Ra, from contaminated soil and/or coal fly ash, e.g. in a landfill, includes growing plants in the soil and/or fly ash; incorporating a root growth inducing auxin in the soil and/or fly ash in the vicinity of the growing plants and subsequently cultivating the plants until a predetermined increase in root mass of the plant roots has occurred. The preferred auxin is 3-4-deoxy-glucosamine, which was found to increase plant root mass by 200% to 800%. An organic synthesis using glucosamine as starting material or a bioengineering process starting with commercial micronized shrimp meal and/or crab meal moistened with water can provide the 3-4-deoxy-glucosamine. Economical embodiments of the process use plants that produce marketable products and recovers valuable metals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABECASSIS DAVIDHUNTINGTON STATION NY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abecassis, David Huntington Station, US 35 118

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00