Procedure for obtaining raw material resulting from waste material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11105507
SERIAL NO

15999752

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The procedure (1) for obtaining raw materials resulting from waste material comprises: the supply (A) of harmonic steel resulting from waste material and prepared in a skein to be treated (3); a heat treatment (B) of the skein to be treated (3) for obtaining a treated skein (3a);—a post-treatment (E) of the treated skein (3a) for obtaining steel reusable as raw material; where the heat treatment (B) comprises an inductive exposure step (B1) of the skein to be treated (3) to at least an alternate magnetic field for the induction in the skein to be treated (3) of alternate eddy currents adapted to raise the temperature of same.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLARIA S R LVIA L AMINALE 11 TERNI 05100

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baldinelli, Giorgio Perugia, IT 1 0
Binacci, Giancarlo Terni, IT 1 0
Ferretti, Flavio Terni, IT 3 3
Nigrelli, Luigi Terni, IT 2 0
Vitarelli, Gaetano Turin, IT 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00