Paint multi-tool assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11148108
APP PUB NO 20210023516A1
SERIAL NO

16520513

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A paint multi-tool assembly includes a shaft that has a hooked end that is insertable into a power tool thereby facilitating the shaft to be rotated when the power tool is turned on. A first cylinder insertably receives the shaft thereby facilitating the first cylinder to be inserted into an open end of a paint roller. Thus, the power tool can rotate the paint roller for cleaning paint off of the paint roller. A plurality of fins is each coupled to and extends away from the first cylinder for stirring paint in the paint container. A second cylinder is coupled to each of the fins such that the second cylinder is spaced from the first cylinder. In this way the second cylinder can be inserted into the paint container or be inserted into the open end of the paint roller.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HEDGECOCK AARONJANESVILLE WI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hedgecock, Aaron Janesville, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00