Precast concrete panel patch system for repair of continuously reinforced concrete

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11149384
SERIAL NO

16443271

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A CRCP repair system is provided. The repair system may comprise a precast pavement panel having one or more openings positioned in the bottom, side portions thereof, as well as reinforcing members embedded within the panel. The panel may also include a reinforcing fastening member extending into each of the openings. The repair system may further include a prepared side edge of the CRCP having reinforcing anchoring members epoxy cemented therein and extending therefrom, with the anchoring members configured to extend into the openings of the panel with the panel positioned in the void created by the removed CRCP. The anchoring members may be configured in a pair, with each pair positioned to extend into the opening, with the fastening member extending into the opening between the pair of anchoring members. Each of the fastening members and the anchoring members may have a head on a distal end thereof, with the heads configured to create opposing and overlapping forces within the opening when cementitious adhesive (such as grout) is inserted within the opening and cured.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE FORT MILLER CO. INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Smith, Peter J Gansevoort, US 68 1719

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00