Dowel baskets and jackets with interchangeable dowels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11149385
SERIAL NO

17326271

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A field-assembly dowel basket for concrete construction configured for in-the-field assembly from a small number of component parts, including dowels, dowel jackets, frame wires that are assembled into dowel basket sections. The dowel jackets may support different types of dowels, such as rectangular plate dowels, diamond-shaped plate dowels and rod dowels. The dowel jackets are firmly attached to the frame wires by leg-clip structures with three clips features including two leg clips, which attach to risers of the frame wire, as well as a central clip feature that clips to the crossbar of the frame wire, to securely support the frame wire and dowel to the dowel jacket. Multiple dowel basket sections are joined together by inline connectors connecting adjacent frame wires to fabricate an elongated dowel basket of desired length.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MCTECH GROUP INCP O BOX 626 HERTFORD NC 27944 UNITED STATES OF AMERICA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McDonald, Stephen F Hertford, US 23 98

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00