O, with MHD power and propulsion for one month astronaut rocket voyages to Mars

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11156187
APP PUB NO 20130259186A1
SERIAL NO

13584574

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is an interplanetary rocket propulsion to Mars and the Moons of the nearer outer Planets by means of 6000° K temperature, 100 atmosphere pressure, power generation and propulsion systems that utilize a gas cooled nuclear reactor and metal powder combustion, in combination with water wherein dissociation into oxygen to react with certain metals to form on board retained metal oxides, and to heat the hydrogen from dissociated water as well as on-board liquid hydrogen that is seeded with an alkali metal for use in a linear, Faraday magnetohydrodynamic (MHD) generator that is coaxial with a MHD accelerator for propulsion, wherein water and probable metal sources on planetary bodies would provide rocket fueling by metal oxide reprocessing to metal and for manned permanent life support bases, and for search of high value minerals, gold, silver, aluminum, rare minerals, diamonds, for transport with their lesser gravity back to Earth.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZAUDERER BERTMERION STATION PA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zauderer, Bert Merion Station, US 17 560

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 26, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 26, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 26, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00