Molten salt reactor with molten moderator salt and redox-element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11158431
APP PUB NO 20200105424A1
SERIAL NO

16622729

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Device for producing energy by nuclear fission, and methods of using same. The device comprises a core container of a core container material, which core container encloses an inner tubing of an inner tubing material. The inner tubing and/or the core container has(have) an inlet and an outlet. The device also comprises a molten fuel salt with a fissionable material and a molten moderator salt comprising metal hydroxide(s), metal deuteroxide(s) or a combination thereof and a redox-element having a reduction potential, which is larger than that of the inner tubing material or of the inner tubing material and the core container material. The molten moderator salt is located in the core container, and the molten fuel salt is located in the inner tubing. Alternatively, the molten fuel salt is located in the core container, and the molten moderator salt is located in the inner tubing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEABORG APS2200 KØBENHAVN N

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cooper, Daniel J København Ø, DK 2 30
Nielsen, Jimmy S Roskilde, DK 1 0
Pedersen, Andreas V København Ø, DK 1 0
Pettersen, Eirik E København S, DK 1 0
Schönfeldt, Troels København NV, DK 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 26, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 26, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 26, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00