Combustion chamber with a hot compressed air deflector, in particular for a turbine intended for producing energy, in particular electrical energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11162422
APP PUB NO 20190195130A1
SERIAL NO

16328764

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a combustion chamber (10) of a turbine, in particular a turbine with a thermodynamic cycle comprising a recuperator, for producing energy, in particular electrical energy, comprising a casing (12) with an injection means (52) for injecting at least one fuel, and a hot compressed air intake (32), said casing housing a flame tube (22) with a perforated diffuser (26) for the passage of the hot compressed air and the fuel, and a flame stabiliser (54). According to the invention, the chamber comprises an air deflector (36) arranged facing the hot compressed air intake (32) in order to circulate this hot air in a single axial direction from this intake.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IFP ENERGIES NOUVELLESFRANCE RUEZ - MA MAISON L V E MA MAI SONG UPPER SEINE PROVINCE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baya, Toda Hubert Paris, FR 3 0
Michel, Jean-Baptiste Rueil Malmaison, FR 21 154
Thiriot, Julien Rueil Malmaison, FR 3 0
Valin, Thomas Vincennes, FR 5 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 2, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 2, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 2, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00