Manufacturing method for electronic component including electrode formed by removal of insulating layer by laser light

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11170935
APP PUB NO 20170323725A1
SERIAL NO

15661739

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method for an electronic component includes: a step of forming an insulating layer on an outer electrode body so as to cover the outer electrode body, the outer electrode body being formed on a chip element which forms the electronic component; and a step of removing the insulating layer in a predetermined region of the outer electrode body by applying laser light to the insulating layer in the predetermined region so as to expose the predetermined region. The insulating layer has a higher absorption coefficient for the laser light than a material forming a surface of the outer electrode body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MANUFACTURING CO LTDNAGAOKAKYO-SHI KYOTO 617-8555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iso, Eiji Nagaokakyo, JP 14 64
Izumi, Shinichiro Nagaokakyo, JP 4 53
Kawada, Tsuyoshi Nagaokakyo, JP 5 118
Maki, Yoshifumi Nagaokakyo, JP 24 99
Tomioka, Hirotsugu Nagaokakyo, JP 4 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 9, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 9, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 9, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00