Rail transport system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11173930
APP PUB NO 20190225243A1
SERIAL NO

16335160

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rail transport system includes a rail (10) provided with a first concave portion built thereon, and a rail vehicle comprising a bogie (21) and a vehicle body (22). The bogie (21) has a second concave portion (110) for straddling the rail (10), the bogie (21) movably straddles the rail (10), and the vehicle body (22) is connected to the bogie (21) and is pulled by the bogie (21) to run along the rail (10). The rail transport system according to embodiments of the present disclosure has the advantages of simple structure, low cost, small occupied space, and high stability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BYD COMPANY LIMITEDNO 3009 BYD ROAD PINGSHAN SHENZHEN GUANGDONG 518118

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Junjie Shenzhen, CN 117 1564
Peng, Fanghong Shenzhen, CN 11 28
Ren, Lin Shenzhen, CN 23 41
Zeng, Hao Shenzhen, CN 52 222

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 16, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 16, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 16, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00