Process for hot application of a silylated adhesive composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11174416
APP PUB NO 20150175849A1
SERIAL NO

14574555

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for hot application of an adhesive composition (80) on a support (96), by means of a nozzle (50) applying the adhesive composition (80), a line (88) supplying the nozzle (50) with the adhesive composition (80) to be applied in fluid form, a mixer (30) positioned in the line (88) for the homogeneous mixture of the main components of the adhesive composition before its application; the applied adhesive composition (80) including a silylated prepolymer, a compatible tackifying resin; the adhesive composition having a cross-linking catalyst; the process involving: supplying the line (88) with the silylated prepolymer separated from the cross-linking catalyst, the mixing of the cross-linking catalyst with the main components by the mixer (30), the hot application of the mixed adhesive composition (80) onto a support (96).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOSTIK SA92700 COLOMBES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chartrel, Jean Francois Cuts, FR 10 31
Laferte, Olivier Trosly Breuil, FR 21 65
Lalouch, Lahoussaine Noyon, FR 22 355

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 16, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 16, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 16, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00