Thermally and/or electrically conductive materials and method for the production thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11180625
APP PUB NO 20180291172A1
SERIAL NO

15566238

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Porous polymeric materials having a very high content of thermally conductive and/or electrically conductive fillers. Process for the preparation of the porous composite material including at least one binder-forming polymeric phase and one or more fillers, this process including the stages of hot mixing, by the molten route, the polymeric phase, the fillers and a sacrificial polymeric phase, so as to obtain a mixture, of shaping the mixture and of removing the sacrificial polymeric phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUTCHINSON2 RUE BALZAC PARIS 75008

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ayme-Perrot, David Huningue, FR 21 121
Bureau, Yannick Ferrieres-en-Gatinais, FR 4 5
Dufour, Bruno Champagne sur Seine, FR 42 137
Prebe, Arnaud Amilly, FR 5 9
Sonntag, Philippe Avon, FR 42 238

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 23, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 23, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 23, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00