Method for producing sulfide solid electrolyte and sulfur-based material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11183708
APP PUB NO 20180138545A1
SERIAL NO

15566768

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a method for producing a sulfide solid electrolyte having a high Li ion conductivity, in which the production time can be greatly reduced, and a sulfur-based material that can be used in the production method for a sulfide solid electrolyte. The invention relates to a method for producing a sulfide solid electrolyte containing a lithium element, a sulfur element, a phosphorus element, an iodine element and a bromine element, which includes mixing and grinding lithium sulfide and lithium bromide followed by adding phosphorus sulfide and lithium iodide thereto and reacting them, and relates to a sulfur-based material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aburatani, Ryo Ichihara, JP 26 235
Iwahara, Masahiro Ichihara, JP 12 124
Tanaka, Takumi Shizuoka, JP 70 250
Yamakawa, Fumio Ichihara, JP 7 9
Yanagi, Takuo Toyota, JP 19 73

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 23, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 23, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 23, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00