Multi-part, sprung rail wheel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11186120
APP PUB NO 20190255880A1
SERIAL NO

16329475

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a multi-part rail wheel with a wheel tyre, a wheel body, an elastic body arranged between the wheel tyre and the wheel body and via which the wheel tyre is supported on the wheel body, and at least one clamping element attached to the wheel body from one end face, via which the elastic body is braced against the wheel body and the wheel tyre by clamping means acting on the wheel body, the wheel body consisting of a light metal material in the region where the clamping means act. The rail wheel guarantees secure bracing of the components with simple assembly and disassembly. This is achieved by at least one counter-bearing element being provided on the end face of the wheel body opposite the clamping element. The counter-bearing element consists of a material which has a higher strength than the wheel body material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOCHUMER VEREIN VERKEHRSTECHNIK GMBHALLEESTRASSE 70 BOCHUM 44793

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Murawa, Franz Bochum, DE 7 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 30, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 30, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 30, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00