Superconducting magnet for eddy-current braking for high-speed trains

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11189410
APP PUB NO 20210005367A1
SERIAL NO

17030314

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A superconducting magnet for eddy-current braking for a high-speed train. The superconducting magnet is fixed at a bottom of a bogie of the high-speed train through a connecting mechanism, and an air gap is formed between the superconducting magnet and a top of a guide rail below the bogie. The superconducting magnet after being excited generates an eddy-current effect with the guide rail of the high-speed train, so as to generate a braking force opposite to a traveling direction of the train, thereby braking the high-speed train. A liquid-level meter is provided on the superconducting magnet to detect a position of a cooling agent liquid level in real time. The superconducting magnet withstands vibration impact through elastic tie rod assemblies when the high-speed train is under operation, showing good adaptability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HEFEI INSTITUTES OF PHYSICAL SCIENCE CHINESE ACADEMY OF SCIENCES230031 NO 181 GUCHENG ROAD SANZIGANG TOWNSHIP LUYANG DISTRICT HEFEI CITY ANHUI PROVINCE HEFEI CITY ANHUI PROVINCE 230031

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dai, Wenhua Anhui, CN 6 58
Du, Shuangsong Anhui, CN 2 1
Fang, Chao Anhui, CN 53 108
Song, Yuntao Anhui, CN 56 121
Wei, Jing Anhui, CN 53 460
Zheng, Jinxing Anhui, CN 10 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 30, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 30, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 30, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00