Clamped connection for the continuous connection of a conveyor belt

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11193555
APP PUB NO 20210048090A1
SERIAL NO

16992524

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Clamped connection for connecting two end sections of a conveyor belt which is to be set up as continuous and which has embedded tension members, with two moulded pieces that can be braced against each other, each having a contact surface for an end section of the conveyor belt, between which is arranged a spacer, and in each case an end section can be clamped in a clamping area between the spacer and a contact surface of a moulded piece, and wherein ends of the tension members can be secured in a cast block formed with a casting material and which is braced against the moulded pieces, characterised in that for each end section of the conveyor belt, its own separate cast block is formed, a conveyor belt connected to it, and a method of connecting a conveyor belt.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BEUMER GROUP GMBH & CO KG59269 BECKUM

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
van, Essen Josef Sendenhorst, DE 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00