Control device for shift-by-wire system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11199259
SERIAL NO

17134947

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device supplies electric power to a shift-by-wire system to a sub power supply until starting of an engine by automatic start control is completed after the engine has been stopped by automatic stop control. The control device performs a stopped range switching process in response to outputting of a signal for requiring switching of a shift range from a selection device when electric power is supplied from the sub power supply to the shift-by-wire system. In the stopped range switching process, the shift range is switched to a selected shift range when a voltage of the sub power supply is equal to or greater than a threshold value. On the other hand, the shift range is switched to a neutral range when the voltage of the sub power supply is less than the threshold value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tomita, Takashi Anjo, JP 111 896

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00