Slit device and sheet manufacturing apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11203128
APP PUB NO 20210053244A1
SERIAL NO

16998002

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A slit device including a first transport section which transports a web in a transport direction while nipping the web, a second transport section which is disposed in parallel with a direction intersecting the transport direction of the first transport section and which transports the web in the transport direction while nipping the web, and a cutting section which is disposed between the first transport section and the second transport section in a direction intersecting the transport direction and which cuts the web along the transport direction, in which a cutting position at which the web is cut by the cutting section is a position within a nipping area where the first transport section nips the web along the transport direction, or is a position downstream of the nipping area in the transport direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEIKO EPSON CORPORATIONTOKYO 160-8801

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukasawa, Masanao Nagano, JP 7 3
Yagi, Keisuke Nagano, JP 18 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00