Method for producing a multilayer fiber composite preform for a fiber composite component

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11203825
APP PUB NO 20200010987A1
SERIAL NO

16576134

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method produces a fiber composite preform for a fiber composite component. The fiber composite preform has a plurality of layers of a fiber roving. The method includes: providing a support core for arranging the fiber roving s on a braiding device, the support core having a support core longitudinal axis, producing a first braided fabric layer from fiber rovings on the support core in a first braiding direction parallel to the support core longitudinal axis of the support core by the braiding device, and producing a second braided fabric layer from fiber rovings on the first braided fabric layer by the braiding device. The second braided fabric layer is produced in a second braiding direction parallel to the support core longitudinal axis, the second braiding direction being opposite the first braiding direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAYERISCHE MOTOREN WERKE AKTIENGESELLSCHAFT80809 MÜNCHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dieckmann, Maike Landshut, DE 3 0
Rapp, Florian Munich, DE 5 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00