Assembly-type physical dart target

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11204223
APP PUB NO 20210190462A1
SERIAL NO

16718288

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly-type physical dart target includes assembly plates, engagement strips, and a frame. Each assembly plate is formed by an arrow standing layer and a projection layer, and has surface gloss higher than that of the arrow standing layer. The arrow standing layer has two sliding slots disposed on two sides thereof, respectively, and each sliding slot has a retraction side disposed on a side edge thereof away from the projection layer. Each engagement strip has two protruding side edges and an assembly part disposed thereon, and each protruding side edge is engaged with the sliding slot. Therefore, the target can provide a good projection effect, and make image projection technology work well in physical throwing exercise, and has nice structural strength to form a large target, so that a user can quickly assemble the target or partially disassemble the target for replacing a damaged part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HO MING CHENGNot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ho, Ming-Cheng Kaohsiung, TW 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00