CO rich synthesis gas production

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11213794
APP PUB NO 20190151813A1
SERIAL NO

16308677

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a chemical reactor and reformer tubes for reforming a first feed stream comprising a hydrocarbon gas and steam. The chemical reactor comprises a shell with a heat source and one or more reformer tubes. The reformer tube is arranged to house catalyst material and is arranged to being heated by the heat source. The reformer tube comprises a first inlet for feeding said first feed stream into a first reforming reaction zone of the reformer tube, and a feed conduct arranged to allow a second feed stream into a second reforming reaction zone of the reformer tube. The second reforming reaction zone is positioned downstream of the first reforming reaction zone. The feed conduct is configured so that the second feed stream is only in contact with catalyst material in the second reforming reaction zone. The invention also relates to a process of producing CO rich synthesis gas at low S/C conditions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOPSOE A/S2800 KGS LYNGBY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Østberg, Martin Tune, DK 17 63
Dahl, Per Juul Vedbæk, DK 31 43
Mortensen, Peter Mølgaard Roskilde, DK 60 133

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 4, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 4, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 4, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00