Multi-purpose floor finish composition

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11214697
APP PUB NO 20200255671A1
SERIAL NO

16860747

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composition for use as a floor coating, the composition including an at least one polymer having a solids content, based on a total weight of the composition, an at least one resin having a solids content, based on a total weight of the composition, and an at least one plasticizer having a solids content, based a total weight of the composition. Further, the solids content of the at least one plasticizer to the solids content of the at least one polymer is between about 20% and about 25%, the solids content of the at least one polymer and the solids content of the at least one resin are in a ratio of about 25:1 to about 35:1, and the composition has a percent elongation of at least 100% and a tensile strength of at least 1000 psi, when applied to a surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
S C JOHNSON & SON INCRACINE WI 53403

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carlsen, Russell O Racine, US 7 28
Cook, Teresa L Evanston, US 5 6
Savaglio, Carmine Kenosha, US 13 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 4, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 4, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 4, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00