Method for synthesizing copper-silver alloy, method for forming conduction part, copper-silver alloy, and conduction part

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11217359
APP PUB NO 20200381136A1
SERIAL NO

16634002

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for synthesizing a copper-silver alloy includes an ink preparation step, a coating step, a crystal nucleus formation step and a crystal nucleus synthesis step. In the ink preparation step, a copper salt particle, an amine-based solvent, and a silver salt particle are mixed, thereby preparing a copper-silver ink. In the coating step, a member to be coated is coated with the copper-silver ink. In the crystal nucleus formation step, at least one of a crystal nucleus of copper having a crystal grain diameter of 0.2 μm or less and a crystal nucleus of silver having a crystal grain diameter of 0.2 μm or less is formed from the copper-silver ink. In the crystal nucleus synthesis step, the crystal nucleus of copper and the crystal nucleus of silver are synthesized.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SENJU METAL INDUSTRY CO LTDTOKYO 120-8555
OSAKA UNIVERSITYSUITA-SHI OSAKA 565-0871

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jiu, Jinting Tokyo, JP 12 16
Li, Wanli Osaka, JP 7 1
Suganuma, Katsuaki Osaka, JP 40 260
Ueshima, Minoru Tokyo, JP 40 315

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 4, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 4, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 4, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00