Method for manufacturing rare earth magnet

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11222738
APP PUB NO 20190198209A1
SERIAL NO

16099461

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for manufacturing a rare-earth magnet, the method comprising the steps of preparing a rare-earth magnet raw material powder including R, Fe and B as composition components (R is one or more elements selected from the rare earth elements including Y and Sc); packing the raw material powder into a molding die, and compacting and molding the raw material powder while applying a magnetic field, wherein, in the compacting and molding step, compacting is performed biaxially, in the directions of X and Y axes, when the magnetic field is applied in the direction of Z axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STAR GROUP IND CO LTD(HORIM-DONG) 49 DALSEO-DAERO 85-GIL DALSEO-GU DAEGU 42714

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Dong Hwan Daegu, KR 238 1173
Kong, Koon Seung Daegu, KR 12 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 11, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 11, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 11, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00