Vehicle exhaust system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11225897
APP PUB NO 20190360375A1
SERIAL NO

16519408

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle exhaust system includes a tubular component having an inner surface and an outer surface such that the inner surface defines a primary exhaust gas flow path. The tubular component extends along a central axis from an inlet end to an outlet end. The tubular component includes at least one ridge extending at least partly along a circumference of the tubular component. The at least one ridge includes a first portion angularly extending inwardly from the tubular component, and a second portion disposed downstream of the first portion. The second portion angularly extends inwardly from the tubular component. In some cases, the second portion defines a plurality of openings extending therethrough and spaced apart from each other. In some cases, the tubular component defines a plurality of tube openings disposed downstream of the at least one ridge.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TENNECO AUTOMOTIVE OPERATING COMPANY INC15701 TECHNOLOGY DRIVE NORTHVILLE MI 48168

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baumgartner, Frederick Michael Jackson, US 2 2
Zuver, Garrick Robert Brooklyn, US 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 18, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 18, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 18, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00