Artificial synapse with hafnium oxide-based ferroelectric layer in CMOS back-end

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11244999
APP PUB NO 20190326387A1
SERIAL NO

16502783

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Artificial synaptic devices with an HfO2-based ferroelectric layer that can be implemented in the CMOS back-end are provided. In one aspect, an artificial synapse element is provided. The artificial synapse element includes: a bottom electrode; a ferroelectric layer disposed on the bottom electrode, wherein the ferroelectric layer includes an HfO2-based material that crystallizes in a ferroelectric phase at a temperature of less than or equal to about 400° C.; and a top electrode disposed on the bottom electrode. An artificial synaptic device including the present artificial synapse element and methods for formation thereof are also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ando, Takashi Tuckahoe, US 736 6423
Frank, Martin M Dobbs Ferry, US 125 1621
Han, Jin Ping Yorktown Heights, US 40 73
Narayanan, Vijay New York, US 312 6206
Sun, Xiao Pleasantville, US 127 1037

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00