Curved seal with relief cuts for adjacent gas turbine components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11248705
APP PUB NO 20190383393A1
SERIAL NO

16256322

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flexible seal is used to seal between two adjacent gas turbine components. The flexible seal includes at least one metal ply having a forward end, an aft end axially separated from the forward end, and an intermediate portion between the forward end and the aft end. The intermediate portion defines a continuous curve in the circumferential direction, such that the aft end is circumferentially, and optionally radially, offset from the forward end. A plurality of relief cuts is defined through the at least one metal ply between the forward end and the aft end to increase flexibility and improve sealing in seal slots that are radially offset from one another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Falcone, Christopher Walter Schenectady, US 5 4
Sarawate, Neelesh Nandkumar Niskayuna, US 57 376

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00