Renewable blended syngas from a plasma-based system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11261393
APP PUB NO 20130320679A1
SERIAL NO

13825013

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system for cost-effectively converting a feedstock using thermal plasma, or other styles of gassifiers, into an energy transfer system using a blended syngas. The feedstock is any organic material or fossil fuel to generate a syngas. The syngas is blended with any fuel of a higher thermal content (BTU) level, such as natural gas. The blended syngas high thermal content fuel can be used in any energy transfer device such as a boiler for simple cycle Rankine systems, an internal combustion engine generator, or a combined cycle turbine generator system. The quality of the high thermal content fuel is monitored using a thermal content monitoring feedback system and a quenching arrangement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HEAT IP HOLDCO LLC12 CARDEN PLACE ABERDEEN AB10 1UR

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Juranitch, James C Ft. Lauderdale, US 42 92

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 1, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 1, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00