Horizontal pyrolysis furnace

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11268761
APP PUB NO 20210396470A1
SERIAL NO

16907725

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A horizontal pyrolysis furnace has a kiln and two barrels. The two barrels are respectively a processing barrel rotatably disposed in the kiln and a takeover barrel detachably connected with the processing barrel. Each one of the two barrels has a gate assembly and at least one spiral guiding plate. The gate assembly of the processing barrel is mounted on an end of the processing barrel, and extends out from the kiln. The two gate assemblies of the two barrels are detachably connected such that the two barrels are able to rotate synchronously. The at least one spiral guiding plate is fixed on an inner surface of one of the two barrels, and the spiral guiding plates of both barrels have an identical helical direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHEN HSUAN-JUNGNO 1 LN 99 SHUN'AN ST DOUNAN TOWNSHIP YUNLIN COUNTY
JING LEEI ENTERPRISE CO LTDNO 178 GONGJHENG RD CIANJHEN DISTRICT KAOHSIUNG CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Hsuan-Jung Yunlin County, TW 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00