Emergency method and system for in-situ disposal and containment of nuclear material at nuclear power facility

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11270805
APP PUB NO 20190139658A1
SERIAL NO

16172976

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method to safely isolate mobile radioactive material during an emergency includes a borehole located in close proximity and at a depth sufficient to safely isolate the material and a man-made vertical-oriented gravity fracture located at the bottom end of the borehole. During an emergency, the mobile radioactive material enters the borehole and then passes from there into the gravity fracture. The mobile radioactive material may have sufficient density to further propagate the fracture vertically downward or a dense slurry or fluid could be mixed with the mobile radioactive material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GRAND ABYSS LLC2448 EAST 81ST STREET SUITE 4040 TULSA OK 74137

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Germanovich, Leonid N Atlanta, US 3 0
Murdoch, Lawrence C Clemson, US 14 129
Robinowitz, Marvin Tulsa, US 7 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00