Expanded gas turbine process with natural gas regasification

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11274598
APP PUB NO 20210239042A1
SERIAL NO

16972765

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power plant with a multi-stage intercooled compressor, a combustion chamber, a turbine which is arranged downstream of the combustion chamber, a compressor air line which connects the compressor to the combustion chamber, and a first heat exchanger which is connected into the compressor air line and into an exhaust gas line branching off from the turbine. A first compressor air expander is arranged in the compressor air line between the first heat exchanger and the combustion chamber, and the power plant includes a device for regasifying liquid natural gas, having a natural gas line, wherein a heat exchanger device is connected into the natural gas line between two compressor stages of the compressor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY GLOBAL GMBH & CO KGOTTO-HAHN-RING 6 MUNICH 81739

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Graeber, Carsten Erlangen, DE 27 53
Juretzek, Uwe Erlangen, DE 17 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00