Method for the manufacture of a gear component, and gear grinding machine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11278976
APP PUB NO 20200406382A1
SERIAL NO

16912140

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for the manufacture of a gear component includes, in a soft machining process, introducing a preliminary toothing 3 with a machining allowance 7 that is fixed relative to a final toothing 4 into a blank such that a semi-finished part 2 is produced. The method also includes, in a fine machining process, removing the machining allowance 7 and producing the final toothing 4 of the toothed component. The machining allowance 7 is removed in a single-stage hobbing method by a grinding tool 1, wherein the grinding tool 1 removes the machining allowance completely in a single stroke movement H.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZF FRIEDRICHSHAFEN AG88046 FRIEDRICHSHAFEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barrois, Thomas Saarbrücken, DE 1 2
Hoener, Franz-Josef Alsting, FR 1 2
Klein, Frank Heusweiler, DE 24 173

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00