Pre-booster pumping system for increasing power generation of turbine of thermal power plant

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11280224
APP PUB NO 20210301683A1
SERIAL NO

16828955

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pre-booster pumping system for increasing power generation of a turbine of a thermal power plant includes a booster pump system including an inlet end, an output end and at least one booster pump; the inlet end of the booster pump system being connected to the air draining end of the turbine through an input tube; each booster pump including an air inlet and an air outlet; the waste gas drained from the air draining end of the turbine being inputted to the booster pump; the vapor pressure being increased in the booster pump and then the vapor being outputted from the output end; and a condenser having an input end; the output end of the booster pump system being connected to the condenser through the output tube; the condenser serving to receive the waste gas from the booster pump system and cool the waste vapor as water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELIVAC COMPANY LTDSHANGHAI 155-1 YINGXIU RD QINGPU DISTRICT PR CHINA SHANGHAI SHANGHAI
SHAW RAYMOND ZHOURM301 BLD 39 418 JINXIU DONG RD PUDONG DISTRICT SHANGHAI PR CHINA SHANGHAI
ELIVAC INC27558 HARNESS LANE SALISBURY MD21801 USA (27558 SALISBURY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pan, Xiaoqing Pudong New District, CN 7 4
Shaw, Raymond Zhou Salisbury, US 13 7
Wu, Bin Qingpu District, CN 269 4282

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00