Method of manufacturing irregular electrode

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11283057
APP PUB NO 20200152958A1
SERIAL NO

16604334

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing an irregular electrode includes forming a first electrode line by continuously coating a first electrode slurry on a metal sheet, forming at least one second electrode line formed with a dotted line shape including uncoated portions positioned in parallel to the first electrode line by intermittently coating a second electrode slurry on the metal sheet that does not overlap the first electrode line, and forming the irregular electrode by notching the metal sheet with an irregular shape including the second electrode line and the first electrode line except for the uncoated portions of the at least one second electrode line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG CHEM LTD20 YOIDO-DONG YOUNGDUNGPO-GU SEOUL 150-721

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choy, Sang Hoon Daejeon, KR 91 314
Kim, Cheolwoo Daejeon, KR 13 44
Lee, Taek Soo Daejeon, KR 45 113

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00