Mixed gas supply device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11285446
APP PUB NO 20190232235A1
SERIAL NO

16382611

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mixed gas supply device includes: a hydrogen gas generation unit that includes a hydrogen generator, the hydrogen generator generating hydrogen gas by decomposition of water and supplying the hydrogen gas; a nitrogen gas generation unit that includes a filter, the filter separating nitrogen gas from air and supplying the nitrogen gas; a gas mixing unit that mixes the supplied hydrogen gas and the supplied nitrogen gas and generates mix gas including the hydrogen gas and the nitrogen gas; and a single base on which the hydrogen gas generation unit, the nitrogen gas generation unit, and the gas mixing unit are mounted, the hydrogen gas generation unit, the nitrogen gas generation unit, and the gas mixing unit being integrated. The gas mixing unit supplies the generated mixed gas to outside.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAMAHA FINE TECHNOLOGIES CO LTD283 AOYA-CHO CHUO-KU HAMAMATSU-SHI SHIZUOKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doki, Yuichi Hamamatsu, JP 8 40
Ichinokiyama, Hisashi Hamamatsu, JP 4 6
Kato, Takeshi Shimada, JP 272 4409
Takahashi, Hidemi Hamamatsu, JP 28 184

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 29, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 29, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00