Refractory furnace structure

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11287188
APP PUB NO 20210389052A1
SERIAL NO

17347428

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A furnace containment structure includes a roof assembly including at least one layer of refractory material that includes a first layer of refractory material, a plurality of sidewalls, a plurality of pockets disposed in the first layer of ceramic refractory material, each pocket including a retainer that is spaced apart from sides of the pocket by gaps when the roof assembly is at room temperature, an upper plate disposed above the first layer of refractory material, and a first plurality of suspension rods that pass through first holes in the at least one layer of refractory material and the upper plate, wherein the plurality of suspension rods mechanically couple the retainers to the upper plate to retain the at least one layer of refractory material. The structure can use materials with different thermal expansion rates without cracking at elevated temperatures.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MASTEN JR JAMES WILLIAMEVERETT WA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Masten,, Jr James William Everett, US 30 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 29, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 29, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00