Production device for manufacturing products in the form of sheets or blocks, and method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11292153
APP PUB NO 20190176112A1
SERIAL NO

16327736

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A production device for manufacturing a product in the form of a sheet or a block, including: an initial agitator (1), a primary conveyor belt (2) and a mixing agitator (3); each of initial agitators (1) is configured with the primary conveyor belt (2), one or more stones or a stone-like granular material having a selected particle size and a binder are initially mixed in the initial agitator (1) and then an initial mixture is obtained; the mixing agitator (3) includes a rotating container for undertaking a material; the initial mixture is conveyed to the mixing agitator (3) through the primary conveyor belt (2); more than one initial agitator and matched primary conveyor belts thereof are disposed around the mixing agitator (3) at intervals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VEEGOO TECHNOLOGY CO LTDGUANGDONG 528000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Zhongyuan Foshan, CN 14 23
Qiu, Jianping Foshan, CN 14 118
Zhu, Shiyang Foshan, CN 15 125

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 5, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 5, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00