Method and apparatus for providing a measuring tape with increased cupping

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11293738
APP PUB NO 20220042778A1
SERIAL NO

17417287

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing a measuring tape may include providing a cupped blade with substantially uniform cupping over a longitudinal length of the cupped blade, applying a stress relief operation to a selected portion of only a convex side of the cupped blade to increase curvature of the cupped blade in the selected portion of the cupped blade where the stress relief operation includes bead blasting the selected portion via a dual nozzle shot peening assembly to define a combined bead blast area that is substantially centered with respect to a longitudinal centerline of the blade, and operably coupling the cupped blade to a reel assembly and providing the cupped blade and reel assembly within a housing to define the measuring tape device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BARCLAYS BANK PLC AS COLLATERAL AGENT745 SEVENTH AVENUE NEW YORK NY 10019

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wei, Jimmy New Taipei, TW 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 5, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 5, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00